Rehabilitating cross country pipeline posed diversifed problem. Mainly, dewatering bell-holes, marshy land, arid temperature,
dearth for logistic support, drinking water & food, tracing pigs all day nights, nitrogen-gas fumes used for venting/purging,
huge crane for lifting heavy 42, 34,30 inch valves, pipe spools etc.
Constriction of space, 3-5 meter depth covered pits, no clear access to heavy equipment, concentration of H2S, seated on concrete
base valves, restricted hot works made maintenance of valve tedious.
|
Heavy Pneumatic valve Lifting |
Non-routine maintenance of valve on as and when need basis, irregular excersizng of valves, cause wear & tear on unique
place of the ball. Susequent to non-schedulled maintenance, valves warrant either replacing accessaries, that are obviously
not available in the current market or replacing valve itself.Failing to do so, provides scope for leaks that ultimately leads
to potential incident either to equipment or people.
Clock spring trainer from USA,conducted workshop for Clients' key personnel; Demonstrated application methods and storage
of materials;enabling them to learn key skills.
Carried out, sieved by 40 size, sand blasting to get good profile for coating.Nozzle pressure and mixure of sand was adeptly
applied to get NACE standard.Mind that blasting was on live line. Pressure inside and remaining wall thickness was calculated
with GRI WRAP before blasting. Safety factor was calculated with MOP& MWP.If required , internal pressure was reduced.
Intelligent pigging carried out 2 years before by actual application of coating.Now the crux is to decide remining wall thickness.
Data-by-pig passed 2 years.Possible corrosion changed wall thickness.So need for direct assessment.Its a cumbersome job.Because
the line is about 200-300 kms.Moreover , there was restriction on mechanical excavation.
Filler gives 100% compressive strength of a metal.For dent repairing single wrap applied to hold filler. After curing, clockspring
applied.
Not only did H2S present at higher level. Also the phyrophoric scales added another dimension especially while pigging. Traps
had heavy amount of phyrophoric scales.At places, it was found leak at Kicker valves giving room for Gas in the launching
vessel.
|